156.
24th APRIL 2011. It's time to start on the
bathroom. We want more storage area than we
have at
present, so the old sink unit has been
removed. A new back installed with strengthening battens. |
157.
The new unit will have more 'surface' area
and
cupboards underneath and reach from
side to
side. |
158.
25th APRIL 2011. The new sink top and new
tap.
The framework underneath isn't complete
yet as we have to buy the doors. |
159.
The increased worktop area will prove very useful. |
160.
A sample of the wallpaper we are using to
paper
the bathroom. A back-splash will however
be
placed around the sink. |
161.
26th APRIL 2011. Nothing is fixed - all is loose at the moment. |
162.
From zero storage to some very useful space. |
163.
The backsplash we'll be using. To some
it'll
look familiar!! |
164.
27th April 2011. As if we don't have
enough
decorating in the house, there's the
Gipsy
to do also. The new Wallpaper is hung
in the
bathroom. |
165.
The corners will be beaded with Sealant. |
166.
The new tiling/splash-back for the sink. |
167.
Just a few more tasks to do and the bathroom
will be
finished. |