145. Screwing the 9mm plywood to the framework.

146. Creating a shaped fillet for the rear end with the

 help of Adam.

147. The roof is on, just the two insulation lengths

to sand down so they fit better.

     

148. 11th April 2011. The "big" one. The new roof!

the 7 metre roll is lift onto the roof.

149. Applying sealant to the edges.

150. Ensuring the new aluminium roll is straight. any mistakes now will not be rectifiable.

     
     

151. It really is a "All hands to deck" job.

152. Stapling vital point to hold the aluminium in place

153. Some people just like to pose!

     
     

154. Cutting a hole in the roll of aluminium for the

back window.

155. Still cutting.

156. And still cutting.

     

 