145.
Screwing the 9mm plywood to the framework. |
146.
Creating a shaped fillet for the rear end with the help
of Adam. |
147.
The roof is on, just the two insulation lengths
to sand
down so they fit better. |
148.
11th April 2011. The "big" one. The new roof!
the 7 metre roll is lift onto the roof. |
149.
Applying sealant to the edges. |
150.
Ensuring the new aluminium roll is straight. any mistakes now will not be
rectifiable. |
151.
It really is a "All hands to deck" job. |
152.
Stapling vital point to hold the aluminium in place |
153.
Some people just like to pose! |