|
|
|
|
|
|
|
|
|
|
|
|
49.
This wall is now complete.
|
50.
Start of the framing for the nearside
|
51.
Kitchen wall under construction. |
|
|
|
|
|
|
|
|
|
52.
View of the offside. |
53.
As with all restorations, Clare
and
Marv copy the original framing. |
54.
With some exceptions such as the extra bracing in the lounge wall. |
|
|
|
|
|
|
|
|
|
55.
Lockers, door frame etc offered up to get the framing dead right. |
56.
View looking forward toward the
front of the van |
57.
Marc shows the near completed offside wall. |
|
|
|
|
|
|
|
|
|
58.
As with the nearside the new framing
is laid out on tressles and the ali
panels laid on top. |
59.
Any small adjustments are then made. |
60.
Offside overhead cab. |
|
|
|
|
|
|
|
|
|
61.
Every edge and opening is examined.
|
62.
The completed wall framing.
|
63.
Door offered up. |
|
|
|
|
|
|
|
|
|
64.
Both walls are given several coats
of a wood preservative. |
65.
Next job is to tackle the roof. This job starts by removing the backbumper. |
66.
Then the bumper rail is removed. |
|
|
|
|
|
|
|
|
|
67.
Not looking pretty but it looks original. |
68.
Upper bike rack/ladder rail being removed. |
69.
Rear badge and back window are taken out. |
|
|
|
|
|
|
|
|
|
70.
Roof Skylights are vents are removed. |
71.
The ali roof is rolled up and over the Cheetah. |
72.
Another view. |
|
|
|